MI250 vs V100
The MI250 delivers 362 TFLOPS (FP16) with CDNA2, while the V100 provides 125 TFLOPS with Volta. Choose MI250 for higher performance, V100 for lower cost.
Overview
AMD MI250
Previous-gen AMD data center GPU for HPC and scientific computing.
Memory per GPU
4x more on MI250
MI250
V100
Memory bandwidth
3.6x higher on MI250
MI250
V100
GPU interconnect
1.3x higher on MI250
MI250
V100
Peak performance (FP16)
2.9x higher on MI250
MI250
V100
Vendor peak figures. Sparsity and tensor-core conventions differ between vendors.
Precision support
MI250
V100
Highlighted formats are supported by only one of the two.
Architecture
MI250
V100
Released
4 years newer on MI250
MI250
V100
Source: MI250 datasheet and V100 datasheet.
Price comparison
Cheapest on-demand
MI250
V100
Typical rate
1.6x higher on MI250
MI250
V100
Median across providers, one vote each, so a large catalog does not outweigh a small one.
Spot floor
MI250
V100
Full price range
MI250
V100
Lowest to highest listing per GPU-hour, across on-demand, spot, reserved and custom.
Providers listing it
20 more on V100
MI250
V100
Heads up: We do our best to keep these specs & prices accurate. However, cloud costs may fluctuate based on region, usage, and other factors not listed here. These are estimates based on common setups and are for informational purposes only. Always verify current rates & exact specs with the provider before provisioning.
Offers and availability
How this list works
Order
Each provider appears once per GPU. We pick the one configuration that speaks for that provider, and rank on it in this order:
- Availability: in stock, then waitlist, then not reported, then out of stock. A price you can act on outranks a cheaper one you cannot.
- Billing type: on-demand first, then reserved, then spot, then quote-only. On-demand leads because it is the only rate you can hold without committing to anything.
- Price: the lowest per-GPU hourly rate the provider lists, converted to USD.
The configuration we pick is chosen the same way, availability before billing before price. The rest of that provider's configurations are on the GPU's own page.
Ties sort alphabetically. Reserved rates are not separated by term length, so a three-year commitment can sit above a one-month one: the label beneath each price says which you are looking at. Providers who publish no rate are listed last within their group.
Transparency and funding
- Ads and sponsors: Paid placements sit at the top of the list and are always labeled as sponsored content. Sponsorship never influences the organic ranking itself.
- Affiliates: Affiliate links are marked. We may earn a commission if you click them, but commissions never affect the order.
- Prices: Shown in USD, converted at daily reference rates where a provider publishes in another currency. A month means 720 hours. How we estimate costs.
MI250 Offers
No provider publishes a stock status, 1 more publish no status.
V100 Offers
11 of 13 providers report available stock, 8 more publish no status.
Similar GPUs
Other comparisons in the same class:
Our data for AMD MI250 was last updated on Aug. 21, 2026, and for Nvidia V100 on Aug. 21, 2026.